Skip to main content
Loading…
This section is included in your selections.

Subsequent to the approval of a tentative parcel map; the subdivider shall furnish to the city engineer copies of the proposed parcel map (the number of copies shall be determined by the city engineer) prepared in conformance with the Land Surveyor’s Act and Subdivision Map Act and generally accepted engineering practices and the following requirements. The map copies shall be accompanied by a traverse sheet(s) or computer closures in a form approved by the city engineer giving bearings; distances and coordinates of the boundaries of the subdivision; interior blocks, lots and centerline of roads; any required soils; geological reports, preliminary subdivision title reports and any documentation which may be helpful in reviewing the parcel map, easements; CC&R’s; and rights-of-way. Where conditions have been imposed on an approved tentative parcel map; the subdivider shall submit evidence of having satisfied the conditions. Where improvements have been required as a condition of the tentative parcel map; sets of improvement plans (the number of sets shall be determined by the city engineer) prepared in conformance with generally accepted engineering (or other professional) practice and meeting all city standards shall be submitted to the city engineer; along with hydrology; hydraulic and other necessary calculations and information required by the city engineer. The improvement plan copies shall be accompanied by all applicable plan review fees; as prescribed by city resolution.

A. The city engineer shall circulate the documents to all affected departments and agencies who shall review the same and notify the city engineer in writing of any revisions; additions; etc.; necessary to ensure conformance with the tentative parcel map and standard specifications in accordance with Section 66456.2 of the Subdivision Map Act. Subsequent to the receipt of comments, the city engineer shall notify the subdivider of corrections necessary to the map; plans; and accompanying documents. The subdivider shall make all required revisions and resubmit for further review. The city engineer shall notify the subdivider when the review process has been satisfactorily completed.

(Ord. 1917 NCS §5 (part), 1993.)