Skip to main content
Loading…
This section is included in your selections.

Sanitary sewer facilities connecting with the existing city sewer system shall be installed to serve the subdivision with a separate private lateral for each lot and to grades and sizes shown on the plans signed by the city engineer. No septic tanks or cesspools will be permitted. (Ord. 1046 NCS §1 (part), 1972; prior code §22.8.105.)