Within twenty-four months after approval or conditional approval of the tentative map; a subdivider shall cause his subdivision; or any part thereof; to be surveyed and a final map thereof prepared in conformance with the tentative map as approved, including conformance with any conditions attached to such approval. The tracing; one polyester base film; two cloth linens; five paper prints of the final map and all required data as specified in

Section 20.24.020 shall be filed with an application to the city engineer. At the time of application for the final map; the subdivider must submit improvement plans containing all necessary engineering support data and calculations applicable thereto; as specified in writing on a form or forms prescribed by the engineering department. Said improvement plans must comply with all conditions required on the approved tentative map. The city engineer shall indicate upon all copies of the final map and improvement plans the date of filing; which shall be the date on which the application is certified as tentatively complete. An extension of time for the filing of the final map may be granted upon consent of the planning commission and the applicant for a period or periods not to exceed an additional twelve months. (Ord. 1501 NCS §1, 1982; Ord. 1289 NCS §15, 1978; Ord. 1046 NCS §1 (part), 1972; prior code §22.6.100.)