Skip to main content
Loading…
This section is included in your selections.

The review of the application for a permit shall take into consideration, but shall not be limited to, the following criteria:

A. Whether the grading is not excessive beyond that necessary for the permitted use of the site;

B. Whether the slopes can be effectively protected against erosion and slippage;

C. Whether the finished contours are relatively natural and do not distort the natural contours;

D. Whether hillside sites are suitable for development in the manner proposed;

E. Whether the removal of natural vegetation is not excessive and that it is done in a manner which will minimize erosion.

F. Whether the SWPPP complies with the requirements set forth in the state’s NPDES general construction permit.

(Ord. 2210 NCS §6, 2005; Ord. 1576 NCS §1 (part), 1984.)