Ordinance 2775 NCS
- Description
- Adds Ch. 17.09; amends § 17.04.010(J), all-electric construction in newly constructed buildings
- Disposition
- Codified
- Adoption Date
- 5/17/2021
- Document Version
-
This enactment was codified in the 9/13/2021 version.
View - Affecting
- 17.09.010, Applicability (Added by §5)
- 17.09.020, Definitions (Added by §5)
- 17.09.030, Requirement for all-electric construction in newly constructed buildings (Added by §5)
- 17.09.040, Exceptions (Added by §5)
- 17.09.050, Infeasibility waiver (Added by §5)
- 17.09.060, Violations (Added by §5)
- 17.09.070, Periodic review and administrative regulations (Added by §5)
- 17.09.080, Energy code not amended (Added by §5)
- 17.09.090, No appliance or appliance system requirement (Added by §5)
- Previously Affecting